ยง 818.03. Vessels Carrying Oil As Secondary Cargo (VCOASC) Plan Content

To the degree the information required by Subsections 818.03(b) through (l) exists elsewhere, copies of the pre-existing information may be submitted. If the information provided is not sufficient to meet the requirements of this subchapter, additional information may be requested by the Administrator.

(a) Introductory Material

(1) Each plan shall provide the following information for each vessel carrying oil as secondary cargo (VCOASC, as defined in Section 790 of this subdivision) covered by the plan:

(A) the vessel's name, country of registry, call sign, and official identification number;

(B) name, address, phone number, fax number and e-mail address, if available, of the owner and/or operator of the vessel(s). This information shall be referenced in the plan title or on a title page at the front of the plan;

(C) the name, address, phone number, fax number and e-mail address, if available, of the person to whom correspondence should be sent;

(D) a certification statement signed under penalty of perjury by an executive within the plan holder's management who is authorized to fully implement the oil spill contingency plan who shall review the plan for accuracy, feasibility, and executability. If this executive does not have training, knowledge and experience in the area of oil spill prevention and response, the certification statement must also be signed by another individual within the plan holder's management structure who has this requisite training, knowledge, and experience. The certification shall be submitted according to the following format;

"I certify, to the best of my knowledge and belief, under penalty of perjury under the laws of the State of California, that the information contained in this contingency plan is true and correct and that the plan is both feasible and executable."

_____________________________________________(signature), (title), (date);

(E) the California Certificate of Financial Responsibility (COFR) number for the tank vessel(s) covered by the plan shall be included in the front of the plan, or for fleet plans shall be listed separately in a subsection of the plan.

(2) Each plan shall identify a Qualified Individual, as defined in Chapter 1, Section 790 of this subdivision, and any alternates that may be necessary for the purpose of implementing the plan and documentation that the Qualified Individual acknowledges this capacity. If an alternate or alternates are identified in the plan, then the plan shall also describe the process by which responsibility will be transferred from the Qualified Individual to an alternate. During spill response activities, notification of such a transfer must be made to the State Incident Commander at the time it occurs.

(3) Each plan shall provide the name, address, telephone number and facsimile number of an agent for service of process designated to receive legal documents on behalf of the plan holder and documentation that the agent for services of process acknowledges this capacity. Such agent shall be located in California.

(4) Each plan shall identify a Spill Management Team (as defined in Section 815.05(p) of this subchapter), and provide documentation that the Spill Management Team acknowledge this capacity.

(5) Each plan shall contain a copy of the contract or other approved means (as defined in Section 818.05(b) of this subchapter), verifying that any oil spill response organization(s) that are named in the plan will provide the requisite equipment and personnel in the event of an oil spill. Plan holders shall only contract with an OSRO(s) that has received a Rating by OSPR (as specified in Section 819 of this subchapter) for the booming, on-water recovery and storage, and shoreline protection services required.

(b) VCOASC Description

(1) Each plan shall describe the vessel's design and operations with specific attention to those areas from which a spill could reasonably be expected to impact the marine waters of California. This description shall include, at a minimum, the following information:

(A) a piping and tank diagram including the location of valves, vents and lines; the age, design, and construction of the vessel; the range of oil products normally carried in each structure; and safety equipment;

(B) a description of the types, physical properties, health and safety hazards and maximum storage or handling capacity of the oil or product carried. A material safety data sheet (MSDS) or equivalent will meet some of these requirements and can be maintained separately aboard the vessel providing the plan identifies its location;

(C) the vessel's classification, hull type, gross registered tonnage (GRT), oil cargo capacity, length, draft and beam.

(c) Prevention Measures

(1) Each plan holder shall take all appropriate prevention measures designed to reduce the possibility of an oil spill occurring as a result of allisions, collisions, groundings, explosions or operator error during the operation of the VCOASC. Each plan shall include a summary of the policies, programs, guidelines and/or procedures designed to implement the following:

(A) methods to reduce spills during transfer and storage operations, including overfill prevention measures, and immediate spill containment provision. Any information developed in compliance with Title 33 CFR, Parts 154 and 156 may be substituted for all or part of any comparable prevention measures required by this subsection;

(B) procedures to assure clear communication among all the parties involved during transfer operations;

(C) use of vessel traffic service systems where available;

(D) procedures to be used to avoid the known navigational hazards.

(E) Where a plan holder's VCOASC is engaged in transfer operations at a facility subject toPublic Resources Code 8755, and the plan holder is in compliance with State Lands Commission regulations for oil transfer operations, the plan holder shall be, considered in compliance with the provisions of this subsection.

(F) The plan holder shall provide additional relevant information to the Administrator upon request.

(2) [Reserved]

(3) At the time the initial contingency plan is submitted, the owner/operator shall either submit a Certificate Of Inspection (COI) issued by the USCG or a certificate issued by a member of the International Association of Classification Societies certified by the International Maritime Organization (IMO) of the most recent vessel inspection, or verify that the vessel has such a certificate and that the certificate is available for review.

(4) The owner/operator shall also submit a Safety Management Certificate to demonstrate compliance with the performance elements in the International Safety Management (ISM) Code subject to IMO Resolution A.741(18), or shall submit proof of compliance with the American Waterways Operators (AWO) Responsible Carrier Program, if applicable.

(d) Planning for the Location of Response Resources

The owner/operator must be prepared to respond to a spill anywhere within the marine waters of California where the VCOASC transits. To determine the regions in which response equipment and personnel must be available, the owner/operator shall include in the plan a description of the VCOASC's normal routes of travel including a list of each of the six Geographic Regions that the VCOASC transits along these routes. OSPR has developed Shoreline Protection Tables (SP Tables (see Section 790)), incorporated by reference herein and posted at OSPR's website) for VCOASC traffic in California's marine waters. Owners/operators shall meet the response resource and time frame requirements for the appropriate Small Harbor from the SP Tables when contracting for shoreline protection services.

(e) Containment Booming and On-Water Recovery

Each plan holder must contract for containment booming and on-water recovery response resources up to their Response Planning Volume for all potential spills from the VCOASC that could reasonably be expected to impact the marine waters of California. Additionally, each plan must also demonstrate response capability sufficient to address potential spills in each Geographic Response Plan Area (GRA), if available, or Geographic Region through which the vessel may transit. (GRA's are geographic subdivisions of ACP area.) To determine the amount of response resources for containment booming and on-water recovery, each plan holder must calculate a Response Planning Volume as outlined below:

(1) Reasonable Worst Case Spill

To calculate the Response Planning Volume, it is first necessary to determine the reasonable worst case spill for each vessel. The reasonable worst case spill is calculated as 30% of the vessel's total cargo capacity of petroleum products.

(2) Persistence and Emulsification Factors

(A) The reasonable worst case spill volume is then multiplied by a persistence factor relative to the most persistent type of oil that each VCOASC carries over the marine waters of California. The persistence factors are specified below:


Oil Group Group 1 Group 2 Group 3 Group 4

Persistence Multiplier .20 .30 .50 .50



(B) Emulsification Factors: The volume determined from the calculation above is then multiplied by one of the following emulsification factors, again, based on the type of oil.


Oil Group Group 1 Group 2 Group 3 Group 4

Emulsification 1.0 1.8 2.0 1.4
Multiplier



(C) Response Planning Volume

The total determined by this calculation is a Response Planning Volume.

1. The Response Planning Volumes to be used to determine the amount of equipment and services required shall be the greater of the amount necessary to address the Response Planning Volume as calculated in Subsections 818.03(e)(1) - (2) or the Planning Volume for On-water Recovery for Inland/Near-shore Environment calculated for the vessel's federal response plan prepared pursuant to 33 CFR, Part 155.1045. The Planning Volume for On-water Recovery is the Adjusted Volume from the federal calculations determined prior to establishing response tiers utilizing the mobilization factors.

2. The calculations used to determine the Response Planning Volume shall be included in the plan.

(3) Response Capability Standards

The equipment and personnel necessary to address the Response Planning Volume is brought to the scene of the spill over a period of time. The timeframes are dependent upon the GRA or Geographic Region in which the VCOASC transits.

The standards set forth in this section may not reflect the exigencies of actual spill response. However, these are the standards that must be used to determine the amount of equipment and personnel that must be under contract or other approved means. Response resources in addition to those under contract must be identified and a call-out procedure in place to access this equipment if the VCOASC has a spill that exceeds the Response Planning Volumes. The owner/operator is ultimately responsible for addressing the entire volume of an actual spill regardless of the planning volumes.

(A) On-Water Daily Recovery Rates and Containment Boom Amounts

1. The total amount of on-water containment and recovery equipment and services required shall be the amount necessary to address the Response Planning Volume determined in Subsection 818.03(e)(2)(C), as follows:

i. VCOASC that transit in High-Volume Ports shall have sufficient on-water containment and recovery equipment and services to respond to 10% of the calculated Response Planning Volume (as calculated in Sections 818.03(e)(1)-(2)) at the scene of the spill within two hours. There shall be sufficient on-water containment and recovery equipment and services to respond to the remaining Response Planning Volume within 12 hours.

ii. VCOASC operating in Facility Transfer areas or the Santa Barbara Channel area shall have sufficient on-water containment and recovery equipment and services to respond to 10% of the calculated Response Planning Volume (as calculated in Sections 818.03(e)(1)-(2)) at the scene of the spill within 12 hours. There shall be sufficient on- water containment and recovery equipment and services to respond to the remaining Response Planning Volume within 36 hours.

iii. VCOASC that transit along the Balance of the Coast shall have sufficient on-water containment and recovery equipment and services to respond to 10% of the calculated Response Planning Volume (as calculated in Sections 818.03(e)(1)-(2)) at the scene of the spill within 18 hours. There shall be sufficient on-water containment and recovery equipment and services to respond to the remaining Response Planning Volume within 36 hours.

(4) Transfer Operations

Each plan shall demonstrate that the VCOASC owner/operator owns or has access to sufficient and appropriate boom, trained personnel and equipment, maintained in a stand-by condition, such that at least 600 feet of boom can and will be deployed for the most effective containment immediately, but no longer than 30 minutes after the discovery of a spill. Additionally, each plan holder shall identify the equipment, personnel and procedures such that an additional 600 feet of boom can and will be deployed within one hour for the most effective containment in the event of an oil spill. Response resources owned or under contract to the marine facility or vessel engaged in oil transfer operations may be used to meet this requirement.

(5) On-Water Response Equipment and Services

(A) Each plan shall demonstrate that the VCOASC owner/operator has under contract or other approved means (as defined in Section 815.05(b) of this subchapter) access to all necessary response resources to comply with the Response Capability Standards for containment booming and on-water recovery established pursuant to Subsection 818.03(e). The amount of response equipment required will take into account the effective daily recovery capacity (as defined in Chapter 1, Section 790 of this subdivision) of the oil recovery equipment.

(B) The equipment identified for a specific area must be appropriate for use in that area given the limitations of the geography, bathymetry, water depths, tides, currents and other local environmental conditions. For those areas that require shallow-water response capability (refer to the relevant U.S. Coast Guard Area Contingency Plan), the plan shall provide for an adequate number of shallow-draft vessels (as defined in Section 815.05 of this subchapter) to be owned or under contract or other approved means and available to respond to provide shoreline protection of all sensitive sites identified in the trajectory analysis conducted as part of the Environmental Consequence analysis. Additionally, the equipment identified shall also be appropriate for use on the type of oil identified. To the extent that the following information is provided by a Rated OSRO, evidence of a contract or other approved means with a Rated OSRO will suffice:

1. the location, inventory and ownership of the equipment to be used to fulfill the response requirements of this subchapter;

2. the manufacturer's rated capacities and operational characteristics for each major item of oil recovery equipment;

3. the type and capacity of storage and transfer equipment matched to the skimming capacity of the recovery systems;

4. the effective daily recovery capacity (as defined in Chapter 1, Section 790 of this subdivision) for each major piece of on-water recovery equipment listed, as well as the effective daily recovery capacity for the skimming systems as a whole.

i. A request may be submitted to the Administrator to review the effective daily recovery capacity for a piece of equipment if it can be shown that the equipment has a different capacity than the derating factor allows.

ii. The Administrator's decision regarding a change in the effective daily recovery capacity for a piece of equipment will be issued as soon as administratively feasible.

5. vessels designated for oil recovery operations, including skimmer vessels and vessels designed to tow and deploy boom;

6. procedures for storage, maintenance, inspection and testing of spill response equipment under the immediate control of the operator;

(f) Shoreline Protection

Each plan must provide for shoreline protection in the Small Harbor the VCOASC may transit. Each plan shall demonstrate through contracts(s) or other approved means, the response resources necessary to protect each type of shoreline and all applicable sensitive sites as outlined in the appropriate Small Harbor as listed in the SP Tables (see Section 790), incorporated by reference herein. The SP Tables shall be reviewed, and updated if needed, annually by OSPR staff. using the procedures outlined in the Administrative Procedure Act.

(1) Shoreline Protection Requirements for Vessels Operating in Small Harbors

Included in the SP Tables is a listing of Small Harbors throughout the state. The requirements in the Small Harbor Table apply to all vessels over 300 GT that operate in the small harbors as listed. The following apply to the Small Harbor Table only:

(A) Non-dedicated resources are allowed for shoreline protection for the vessels that operate in these harbors.

(B) The amounts of boom, boats and staff, as listed, are required for the vessels that operate in these harbors. In some locations additional response resources may be required for included or adjacent sensitive sites if this has been identified in the applicable ACPs.

(C) Resource requirements can be met either with pre-positioned equipment (as identified in the owner/operator's Contingency Plan) or by a contract with a Rated OSRO. Advance notice to the OSRO is required before the plan holder can begin operating in the small harbor.

(D) Unless otherwise specified in the Small Harbor Table, anytime that a vessel over 300 GT operates in these small harbors, that vessel shall have a contract or other approved means for a minimum of 2,500 feet of boom that can be deployed in 6 hours.

(E) An owner/operator may propose lesser amounts of shoreline protection resources than that listed in the Small Harbor Table, for carrying out planned projects in the Balance of the Coast, upon petitioning and approval of the Administrator. The proposal may be tested by the Administrator anytime prior or subsequent to plan approval.

(2) Shoreline Clean-Up

(A) Each plan shall describe methods to clean up spilled oil and remove it from the environment. The owner/operator shall have a contract or other approved means to provide the appropriate shoreline clean up services. The equipment identified for a specific area must be appropriate for use in that area given the limitations of the bathymetry, geomorphology, shoreline types and other local environmental conditions. Additionally, the equipment identified shall be appropriate to implement all the applicable strategies, and appropriate for use on the type of oil identified. The description shall include:

1. methods for shoreside clean-up, including containment and removal of surface oil, subsurface oil and oiled debris and vegetation from all applicable shorelines, adjacent land and beach types; and

2. measures to be taken to minimize damage to the environment from land operations during a spill response, such as impacts to sensitive shoreline habitat caused by heavy machinery or foot traffic.

(g) Response Procedures

(1) Each plan shall describe the organization of the VCOASC's spill response management team. An organizational diagram depicting the chain of command shall also be included. Additionally, the plan shall describe the method to be used to integrate the plan holder's organization into the State Incident Command System and/or the Unified Command Structure as required by Title 8, California Code of Regulations, Subsection 5192(q)(3)(A).

(A) The plan holder may utilize the procedures outlined in the appropriate and most recent Federal Area Contingency plan when describing how the vessel's chain of command will interface with the State Incident Command System which utilizes the Unified Command.

(2) Each plan shall include a checklist, flowchart or decision tree depicting the procession of each major stage of spill response operations from spill discovery to completion of clean-up. The checklist, flowchart or decision tree shall describe the general order and priority in which key spill response activities are performed.

(3) Each plan shall describe how the owner/operator will provide onboard emergency services before the arrival of local, state or federal authorities on the scene, including:

(A) procedures to control fires and explosions, and to rescue people or property threatened by fire or explosion;

(B) procedures for emergency medical treatment and first aid,

(4) Each plan shall describe equipment and procedures to be used by VCOASC personnel to minimize the magnitude of a spill and minimize structural damage which may increase the quantity of oil spilled.

(5) Each plan shall detail the lines of communications between the responsible party, the Qualified Individual and the on-scene commanders, response teams, local, state, and federal emergency and disaster responders, including:

(A) communication procedures;

(B) the communication function (e.g., ground-to-air) assigned to each channel or frequency used;

(C) the maximum broadcast range for each channel or frequency used; and

(D) redundant and back-up systems.

(6) Each plan shall provide for post-spill review, including methods to review both the effectiveness of the plan and the need for plan amendments.

(A) The result of the review shall be forwarded to the Administrator within 90 days following the completion of response and clean-up procedures.

(B) The review shall be used by the Administrator only for the purposes of proposing future amendments to the contingency plan.

(7) Each plan shall describe the procedures to manage access to the spill response site, the designation of exclusion, decontamination and safe zones, and the decontamination of equipment and personnel during and after oil spill response operations, as required by the California Occupational Safety and Health Administration.

(8) Each plan shall describe the procedures for the evaluation of health and safety concerns and the determination of site safety prior to beginning oil spill response operations and clean-up activities.

(h) Notification Procedures

(1) Each plan shall include a list of contacts to call in the event of a drill, threatened discharge of oil, or discharge of oil. The plan shall:

(A) identify a central reporting office or individual who is responsible for initiating the notification process and is available on a 24-hour basis. The individual making this notification must be fluent in English. The following information must be provided:

1. the individual or office to be contacted;

2. telephone number or other means of contact for any time of the day; and

3. an alternate contact in the event the individual is unavailable.

(B) detail the procedures for reporting oil spills to all appropriate local, state, and federal agencies within each of the six Geographic Regions that the VCOASC transits;

(C) establish a clear order of priority for notification.

(2) Immediate Notification

Nothing in this section shall be construed as requiring notification before response.

(A) Each plan shall include a procedure for contacting the OSRO in each of the six Geographic Regions that the VCOASC transits immediately, but no longer than 30 minutes, after the discovery of a discharge of oil or threatened discharge of oil.

(B) Each plan shall include a procedure that ensures that the owner/operator or his/her designee will initiate contact with the Qualified Individual, the California Governor's Office of Emergency Services and the National Response Center immediately, but no longer than 30 minutes, after discovery of a discharge of oil or threatened discharge of oil.

(C) Each plan shall include all phone numbers necessary to complete the immediate notification procedures.

(3) Each plan shall identify a call-out procedure to acquire the resources necessary to address spills that cannot be addressed by the equipment that the owner/operator is required to have under contract. Procedures must allow for initiation of the call-out within 24 hours of the incident and must begin as soon as a determination has been made that additional resources are necessary.

(4) Each plan shall provide a checklist of the information to be reported in the notification procedures, including but not limited to:

(A) VCOASC name, country of registry, call sign, and official number;

(B) location of the incident;

(C) date and time of the incident;

(D) course, speed and intended track of the VCOASC;

(E) the nature of the incident;

(F) an estimate of the volume of oil spilled and the volume at immediate risk of spillage;

(G) the type of oil spilled, and any inhalation hazards or explosive vapor hazards, if known;

(H) the size and appearance of the slick;

(I) prevailing weather and sea conditions;

(J) actions taken or planned by personnel on scene;

(K) current condition of the VCOASC;

(L) injuries and fatalities; and

(M) any other information as appropriate.

(5) Reporting, of a spill as required by Section 818.03(h)(2) shall not be delayed solely to gather all the information required by Subsection 818.03(h)(4).

(6) An updated estimate of the volume of oil spilled and the volume at immediate risk of spillage shall be reported to the California Governor's Office of Emergency Services whenever a significant change in the amount reported occurs, but not less than every 12 hours within the first 48 hours of response. The State Incident Commander and/or the Federal On-Scene Coordinator through the Unified Command shall have the option of increasing or decreasing this timeframe, as needed. Updated spill volume information included in the Incident Action Plan developed through the Unified Command will meet the requirements of this subsection.

(i) Temporary Storage and Waste Management

(1) Each plan shall identify sufficient temporary storage for all recovered oil or all oily waste, or identify facilities that would be able to accept the recovered oil or oily waste for recycling or other means of waste management. Sufficient storage shall be no less than two times the required Response Capability Standards as determined in Subsection 818.03(e)(3).

(2) Each plan shall identify the party that shall maintain responsibility for recovered oil and oily waste for the purposes of temporary storage.

(3) Each plan shall describe site criteria and methods used for temporary storage of recovered oil and oily wastes generated during response and clean-up operations, including known available sites.

(4) Each plan shall identify all applicable permits, and all federal, state and local agencies responsible for issuing those permits for transit, temporary storage and ultimate waste management of all hazardous waste products likely to result from an oil spill.

(5) Each plan shall include information which could expedite the state approval process for the use of temporary waste storage sites, including a list of appropriate contacts and a description of procedures to be followed, for each approval process.

(j) Wildlife Rehabilitation Requirements

Each plan shall describe how oiled wildlife care will be provided by one of the following approved means:

(1) Utilize the California Oiled Wildlife Care Network (OWCN) to meet oiled wildlife care requirements: or

(2) describe procedures that clearly outline how oiled wildlife care will be provided. The equipment, facilities, and personnel necessary to implement these procedures must be identified and assured by contract for each Geographic Area covered by the plan. Standards and written protocols for wildlife care must comply with all applicable State and federal laws.

(k) Training

(1) Each plan shall provide that all appropriate personnel directly responsible to the owner/operator shall receive training in the use and operation of oil spill response and clean-up equipment. The plan shall describe:

(A) the type and frequency of training that each individual in a spill response position receives to achieve the level of qualification demanded by their job description;

(B) the procedures, if any, to train and use volunteers or other additional personnel in spill response operations as necessary for the size of the spill.

(2) Each plan shall describe the type and frequency of personnel training on methods to reduce operational risks. The description of the training shall include, if applicable, the following:

(A) the means of achieving any established training objectives, such as:

1. training programs for each position involved with the various aspects of the operation that could result in a spill (e.g., position responsible for vessel inspections or transfers);

2. a training schedule, including adequate frequency, (e.g., initial training upon hire and annual refresher training) and type of training (workshops, classroom, videotape, on-the-job training, etc.) for each position trained;

(B) licenses, certifications or other prerequisites to hold particular jobs.

(3) Each plan shall provide for safety training as required by state and federal health and, safety laws for all personnel likely to be engaged in oil spill response, including a program for training non-permanent responders, such as volunteers or temporary help.

(4) The VCOASC owner/operator shall ensure that training records are maintained for three years. All such documentation must be made available to the Administrator upon request.

(l) Drills and Exercises

(1) Each plan shall describe the VCOASC's drill and exercise program. The vessel owner/operator shall conduct drills and exercises as necessary to ensure that the elements of the plan will function in an emergency, as described in Section 820.01(a).

(2) Drills shall be designed to exercise either components of or the entire response plan. Such drills, individually or in combination, shall ensure that the entire plan is exercised at least once every three years.